Force Drying Anhydrite Screed

Anhydrite Liquid Screeds dry at a rate 1mm per day up to 40 days then 0.5mm per day after.
This type of screed can be force dried after 7 days. Either connect a tempory boiler or run through your permanent one.
Full drying time between 14-21 days at 50mm depth

Contact Us Today

We would be happy to discuss your requirements or answer any questions you may have.