Foot traffic after 24-48 hours
21 day drying times (dependant on depth of screed and site conditions)
No need to sand once installed
Suitable for underfloor heating
Force dry after 7 days using underfloor heating
Lay floor coverings after 14 days with the UFH commissioned
Suitable for all primers and adhesives
Heating efficiency increased with coverageĀ of just 25mm over pipes
Specialised products for thin self levelling depths of 12mm
Quick and easy installation
We can lay up to 1200m2 a day
Outstanding strength properties