Underfloor Heating must be commissioned and run prior to laying bonded coverings. Once moisture testing is complete in line with BS8204:7:2003 and the screed is confirmed dry, the surface should be treated in line with the Contract Flooring Association requirements, the relevant British Standards and the advice of the adhesive manufacturers.
Preparations remain the responsibility of the floor covering contractor and include lightly abrading the surface. This helps promote primer penetration, provides a key for adhesives and removes extraneous debris e.g. mortar, plaster and mud, and removes loose friable laitance. It is generally unnecessary to remove the top surface of the screed to expose an aggregated finish.