- 1200gu DPM
- Rigid PU Insulation
- Slip membrane
- Wet underfloor heating stapled directly to insulation
- 50mm of Flow Classic on both ground and first floors
Liquid Screed was the developers preferred choice because of the speed at which the work can be completed.
Once the screed is laid work can carry on 24 hours later without any worries of damaging the screed.
As Underfloor Heating was installed, the screed was force dried and tiles were laid just 24 days after.